Every film production budget separates costs into two main categories: above-the-line and below-the-line. The line is not imaginary — it is the literal horizontal line on a budget top sheet that separates creative costs from production costs. Understanding the difference is the first step to building a budget that makes sense to a line producer, a financier, or a funding body.

Need a budget now? Use BudgetBuilder to enter your production parameters and get a full top sheet with sourced rates.

What is above-the-line?

Above-the-line (ATL) covers the creative and rights side of the production. These are the costs that exist before a single frame is shot — the story, the director, the producer, and the principal cast. In industry shorthand, above-the-line is “what you shoot” not “how you shoot it.”

Typical above-the-line categories:

Above-the-line costs are typically negotiated as flat fees or profit participation rather than day rates. They are less predictable than below-the-line costs because they depend on who is attached. A known director commands a different fee than a first-time director, and that has nothing to do with the number of shoot days.

What is below-the-line?

Below-the-line (BTL) covers the production crew, equipment, locations, and everything needed to physically shoot and complete the film. These costs scale with the production parameters — more shoot days means more crew days, more catering, more location fees, more kit hire.

Typical below-the-line categories:

Below-the-line is where the vast majority of a production budget lives — typically 60–70% of the total. Because these costs are driven by the shoot schedule, a line producer can estimate them with reasonable accuracy once the production parameters are set.

Why the distinction matters

The line between ATL and BTL is not just an accounting convention. It has real consequences:

Where post-production falls

Post-production is usually listed as a separate section between BTL and contingency. It is not strictly above or below the line — it has its own categories (editing, colour, sound, music, VFX) because the rate structures are different from both production crew and creative talent.

What this means for your budget

A good production budget shows the line clearly. Above-the-line appears first, below-the-line second, post-production third, and contingency last. Every category subtotal reconciles. Every rate has a visible source. The line is not a barrier — it is a tool for clarity, and it is the first thing a line producer looks for in a top sheet.

BudgetBuilder separates ATL, BTL, post, and contingency in every calculation. Enter your production parameters and see the line drawn for you, with every rate sourced.